We overhaul / retrofit all types of SUI models from the production of TOS / TRENS Trenčín. The complete scope of repair is listed further.
If you have just started looking for a lathe, please see the section of Lathe offers.
SUI40RP – SUI50RP
When repairing machines with a variable speed drive, the original speed controller and motor are replaced with a modern inverter with an asynchronous motor.
Delivery options
We offer the following options for lathe overhauls:
- lathe overhaul of your lathe in our company in Trenčín
- lathe overhaul provided in exchange for your lathe
CE certification
For all lathes we offer a modernization option according to Section 22 of Act 56/2018 Coll. and pursuant to Directive 2006/42/EC of the European Parliament and of the Council and Government Regulation No. 436/2008 Coll.
For a CE update it is necessary to add:
- electric installation modification according to valid regulations
- lead screw and bar guard
Accessories
We offer a option to install a digital readout and supply of chucks, flanges, live/dead centers, rests and other accessories.
Warranty
We offer a 12 month warranty on our lathes.
Service
We offer warranty and post warranty service, as well as a supply of spare parts.
Technical data | SUI32 | SUI40 | SUI50 |
---|---|---|---|
Max. swing over bed | 320 mm | 400 mm | 500 mm |
Distance between centers | 750 / 1000 mm | 1000/ 1500/ 2000mm | |
Swing over carriage | 180 mm | 220 mm | 320 mm |
Spindle bore | 38 mm | 56 mm | |
Internal spindle taper | MORSE 5 | MORSE 6 | |
Inner quill taper | MORSE 4 | MORSE 5 | |
Spindle nose | B5 | B6 | |
Spindle velocity | 20 – 3150 rev./min | 14-2240 rev./min | |
Spindle velocity augmented | – | 18-2800 rev./min |
Overhaul scale / scope of repair
- Dismantling of machine subgroups
- electric installation and motors
- headstock
- carriages and slides
- apron
- thread cutting gear box
- speed gear box
- coverings
- Analysis of subgroups
- Clearing of parts of subgroups
- Review finding
- inspection of parts. The good ones are reused, the worn ones are replaced
- replacement of all bearings and seals
- replacement of all sliding screws and nuts
- Grinding of bed, slides, supports, spindle and tailstock barrel
- Scraping guide surfaces to positions, finishing of gibs
- Production of a new electric installation
- Dismantling of electric motors. Cleaning, replacement of bearings, assembly, inspection. Testing.
- Assembly of machine groups, measurement, positioning according to the precision protocol
- Assembly of other sub-groups of the machine
- Accuracy measurement
- Machine testing
- Final coating of the machine