lathe SUI32 – SUI40 – SUI50 TOS / TRENS Trenčín

Sústruh SUI50RP-2000
SUI32 – SUI40 – SUI50

We overhaul / retrofit all types of SUI models from the production of TOS / TRENS Trenčín. The complete scope of repair is listed further.

If you have just started looking for a lathe, please see the section of Lathe offers.

SUI40RP – SUI50RP

When repairing machines with a variable speed drive, the original speed controller and motor are replaced with a modern inverter with an asynchronous motor.

Delivery options

We offer the following options for lathe overhauls:

  • lathe overhaul of your lathe in our company in Trenčín
  • lathe overhaul provided in exchange for your lathe
CE certification

For all lathes we offer a modernization option according to Section 22 of Act 56/2018 Coll. and pursuant to Directive 2006/42/EC of the European Parliament and of the Council and Government Regulation No. 436/2008 Coll.

For a CE update it is necessary to add:

  • electric installation modification according to valid regulations
  • lead screw and bar guard
Accessories

We offer a option to install a digital readout and supply of chucks, flanges, live/dead centers, rests and other accessories.

Warranty

We offer a 12 month warranty on our lathes.

Service

We offer warranty and post warranty service, as well as a supply of spare parts.

Technical data SUI32 SUI40 SUI50
Max. swing over bed 320 mm 400 mm 500 mm
Distance between centers 750 / 1000 mm 1000/ 1500/ 2000mm
Swing over carriage 180 mm 220 mm 320 mm
Spindle bore 38 mm 56 mm
Internal spindle taper MORSE 5 MORSE 6
Inner quill taper MORSE 4 MORSE 5
Spindle nose B5 B6
Spindle velocity 20 – 3150 rev./min 14-2240 rev./min
Spindle velocity augmented 18-2800 rev./min
series SV18
series SN
series SUI

Overhaul scale / scope of repair

  • Dismantling of machine subgroups
    • electric installation and motors
    • headstock
    • carriages and slides
    • apron
    • thread cutting gear box
    • speed gear box
    • coverings
  • Analysis of subgroups
  • Clearing of parts of subgroups
  • Review finding
    • inspection of parts. The good ones are reused, the worn ones are replaced
    • replacement of all bearings and seals
    • replacement of all sliding screws and nuts
  • Grinding of bed, slides, supports, spindle and tailstock barrel
  • Scraping guide surfaces to positions, finishing of gibs
  • Production of a new electric installation
  • Dismantling of electric motors. Cleaning, replacement of bearings, assembly, inspection. Testing.
  • Assembly of machine groups, measurement, positioning according to the precision protocol
  • Assembly of other sub-groups of the machine
  • Accuracy measurement
  • Machine testing
  • Final coating of the machine

Request a quote